A bathroom is one of the smallest rooms in a home and often one of the most demanding to renovate. Water, electricity, ventilation, heavy fixtures and precise tiling all meet in a few square metres. Most of what makes a bathroom last is hidden behind the tiles, so the order of work and the decisions you make early matter more than the choice of tap.
Decide on the layout before anything is removed
The position of the toilet, shower or bath and washbasin determines where pipes and drains need to go. Moving a toilet in particular depends on where the main drain runs and whether there is enough fall for the waste pipe. Before work starts, think about:
- whether you want a shower, a bath or both
- how much storage you need and where it can go
- who will use the room, including children or older family members
- where the mirror, lighting and sockets should be
- how the room will be ventilated, by a window, an extractor fan or both
A walk-in shower without a step, for example, needs the floor build-up and drainage to be planned from the start. These are not details that can easily be added once the tiles are down.
Renew the installations while the walls are open
If the bathroom is old, the pipes behind the walls are probably as old as the tiles. Since the walls and floor will be opened anyway, this is the right moment to replace water supply and drain pipes, check the shut-off valves and add any new connections you need.
Electrical work in a bathroom needs special care because of water. Sockets, lighting and any electric heating or underfloor heating should be installed by a qualified electrician who follows the rules for wet rooms. Plan the positions of all switches, lights and sockets on a drawing before the walls are closed.
Many people now use concealed cisterns and wall-hung toilets. They make cleaning easier and save some space, but they require a frame installed in the wall or in a built-out section during the rough installation phase.
Waterproofing is the step you never see
Tiles and grout are not fully waterproof on their own. Water that gets through the grout over time can soak into the wall or floor below and cause damage to neighbouring rooms or to the structure. That is why a waterproofing layer is applied under the tiles in wet areas, especially in the shower zone, around the bath and on the floor.
Good waterproofing pays special attention to the weak points: corners, the junction between wall and floor, pipe penetrations and the floor drain. Sealing tapes and collars are typically used in these spots. Each product has its own instructions for drying times and layer thickness, and following them is part of doing the job properly.
Tiling, fixtures and finishing
Once the substrate is level, waterproofed and dry, tiling can begin. Some points worth discussing with your contractor:
- Floor slope. In a shower without a tray, the floor has to fall towards the drain so water does not collect.
- Tile size and layout. Large tiles mean fewer grout joints but need a very flat surface. The layout should be planned so that cut tiles end up in less visible places.
- Grout and silicone. Joints between walls, floors and fixtures are usually finished with flexible silicone, not grout, because these junctions move slightly over time.
- Natural stone. Stone can look beautiful in a bathroom, but some types are sensitive to acids and stains, so ask about the right stone, surface finish and sealing for wet areas.
Fixtures, the washbasin, taps, shower screen and furniture come last, after tiling and grouting are complete.
Plan the timing realistically
Even a small bathroom involves several trades and drying times that cannot be rushed. A typical sequence runs from demolition, through installations, plastering or drywall, screed, waterproofing and tiling, to fixtures and final connections. If the house has only one bathroom, discuss with your contractor how long the household will be without it and whether a temporary solution is needed.